KDG's focus for this project was the rehabilitation of an existing retaining wall and the removal/replacement of multiple structures on site. The existing retaining wall was constructed at the incorrect elevation and required demolition and reinstallation of a new wall utilizing a soil nail construction. KDG worked closely with the geotechnical engineer on this project to collaborate on a design that best meets the DEN's needs. Our work on this project involved multiple site visits to determine existing conditions, structural design of multiple elements, creation and issuing of construction documents, and construction support.